Use Operation and Order Floats for Dispatching 

Usage

You can specify that the operation float and also the floats before/after production for the order can be used when dispatching an operation.

The operation can then be dispatched within the float that was assigned to it in order scheduling.

Prerequisites

If you want to use the additional times for dispatching, activate the dispatching function Operation date check in the strategy profile and set the appropriate indicators.

If you want to use...

set the indicators

operation float

Use operation float

operation float + float after production

Use operation float

 

Use float aft. prod.

operation float +float before production

Use operation float

 

Use float bef. prod.

 

If you set the indicator Terminate dispatching on error then dispatching of the operation is terminated if the times are exceeded.