Changing Time Scale 

Prerequisites

You can change the scale of the time axis on the capacity planning table online. You can thus choose between several firmly defines scales and a variable scale.

The following SAP standard profiles are used for firmly-defined scales:

  • SAP_M011: Standard hourly period split
  • SAP_M022: Standard daily period split
  • SAP_M032: Standard weekly period split
  • SAP_M041: Standard monthly period split
  • SAP_M051: Standard yearly period split

These must therefore exist in the client.

In the variable scale you can change the following: the scale and the scaling for the planning period, the scale relationships and the scalings for the pre-evaluation period and for the post-evaluation period.

Procedure

In the capacity planning table choose the desired scale with Settings Scale.