You can assign a reduction strategy to each operation in the interoperation times section of the Operation Details screen. This strategy specifies
- how many reduction levels may be applied to an operation (maximum of six levels)
- which reduction measures are carried out at the individual levels
You can set reduction strategies in Customizing for routings under Operation Data.
