Reduction Strategy 

You can assign a reduction strategy to each operation in the interoperation times section of the Operation Details screen. This strategy specifies

  • how many reduction levels may be applied to an operation (maximum of six levels)
  • which reduction measures are carried out at the individual levels

You can set reduction strategies in Customizing for routings under Operation Data.