Maintaining Operation Scrap 

Use

The operation scrap is maintained in the BOM under the tab page Basic Data in the item detail screen.

Procedure

To maintain operation scrap in the BOM:

  1. Select the tab page Material in the item overview.
  1. Mark the item for which you want to maintain operation scrap.
  1. Click .
  1. Enter the percentage rate for the operation scrap in the tab page Basic Data, under quantity data, in the field Operation Scrap (%).

If you do not want assembly scrap (if applicable) to be calculated as well set the net indicator (Net-Indicator).

  1. Save your BOM.