Use
In period lot-sizing procedures, the system groups several requirements within a time interval together to form a lot.
Features
- You can define the following periods:
- days
- weeks
- months
- periods of flexible length equal to posting periods
- freely definable periods according to a planning calendar
The system can interpret the period start of the planning calendar as the availability date or as the delivery date.
- Splitting and overlapping are also possible for all period lot-sizing procedures (see Lot Sizes with Splitting and Overlapping).
- The system sets the availability date for period lot-sizing procedures to the first requirements date of the period. However, you can also define that the availability date is at the beginning or end of the period.