Use
You can use the Pegged requirements function to retrace from any BOM level
- which requirements are the source of which procurement proposals
- which independent requirements (especially sales orders) are affected if a procurement proposal is cancelled or a date or quantity is changed on a lower level.
Features
For the MRP element selected, you can display:
- just the pegged requirement(s) on the highest BOM level
The system displays the requirements quantity and the input quantity for each requirement. The input quantity is the portion of the MRP element that is required to cover the displayed requirement. The input quantity is displayed in the base unit of measure of the material.
- the order route; that means all the requirements and replenishment elements that lie between the pegged requirement and the MRP element
If an MRP element contains a quantity that was not caused by a requirement from a higher level, the system displays this quantity separately. Quantities without source arise, if more is produced than is required because of a rounding value for the lot size or a fixed lot size or if procurement proposals have been scheduled manually.