Use
You want the system to create a worklist of particular materials in the material list.
Prerequisites
You have entered the required selection criteria in the collective access to the MRP list or stock/requirements list and have called up the material list of all the materials that correspond to these criteria.
The material list includes the following for each material: traffic light, ranges of coverage, the number of exception messages per exception group, the current plant stock, and various other material data.
Procedure
- In the material list, select the materials for which you want to display the MRP lists or stock/requirements lists:
- individual materials by clicking on the line
- all materials by using

- a block of materials by clicking on the first and last line and then choose
.

You can find the required materials in two ways:
- with the search function in the material list using
. For example, you search for all the materials with stocks that are sufficient for less than two weeks. - by sorting the material list using
. For example, you sort the material list so that all materials for which an opening date in the past was determined (exception group 1) are displayed first.
- To access the appropriate list, double-click the first material or choose
Selected stock/requirements lists or
Selected MRP lists.
The system displays the list for the first material.
- Choose Show material tree.
Result
The system displays all the materials that you selected in the material list in a worklist tree on the left-hand side of the screen. Double-click the appropriate material in this tree, or choose
and
, to change from list to list.