Changing/Displaying the Requirements of the Planning Scenario 

Procedure

If you want to access the total requirements of a material with reference to a planning scenario, proceed as follows:

  1. Starting from the Long-term Planning node, choose Planned indep.reqmts  Reqmts for scenario.

The system branches to the initial screen for the evaluation.

  1. In the initial screen, enter the following data:
    • To call up the total requirements for a material directly, enter the material number in the Material field.
    • To check an MRP controller’s complete list of materials, enter an MRP controller in the MRP controller field.

The system displays the screen entitled Planned Indep. Reqmts 🡪 Long-Term Planning: Planning Table.

In the table, the system displays the material number, the plant, the version and the planned independent requirements schedule lines.

You can change the planned independent requirements.