Changing/Displaying the Requirements of the Planning Scenario 
Procedure
If you want to access the total requirements of a material with reference to a planning scenario, proceed as follows:
- Starting from the Long-term Planning node, choose Planned indep.reqmts → Reqmts for scenario.
The system branches to the initial screen for the evaluation.
- In the initial screen, enter the following data:
- To call up the total requirements for a material directly, enter the material number in the Material field.
- To check an MRP controller’s complete list of materials, enter an MRP controller in the MRP controller field.
The system displays the screen entitled Planned Indep. Reqmts 🡪 Long-Term Planning: Planning Table.
In the table, the system displays the material number, the plant, the version and the planned independent requirements schedule lines.
You can change the planned independent requirements.