Creating a Routing 

Use

You use this procedure to create a completely new routing.

If a routing already exists in your system with similar data, you can copy this data into the new routing. In this case use the procedure Creating Routings by Copying

Prerequisites

The following data already exists in the system:

  • If you want to maintain the routing with history: The corresponding change master record.
  • If you want to link the routing with a revision level: The relevant revision level of the material to be produced.

Procedure

  1. On the R/3 main menu choose Logistics  Production  Master data  Routings and then Routings  Routing (or other task list type)  Create. Note: In the following procedure the task list type Routing is referred to, primarily in menu paths. The same paths are also valid for the other task list types (reference operation sets, rate routings and reference rate routings). If you want to maintain such an object choose the <task list type> instead of Routing.
  2. Enter the relevant data on the initial screen.
  3. Choose Enter.

The screen that then appears depends on whether you are creating a new group or adding to an existing group.

Activity

The following screen is displayed.

Create group

Create Routing Header Details

Continue as in Step 5.

Add to group

Create Routing Header overview

Continue as in Step 4.

 

  1. Choose Edit  New entries.
  2. Enter the data on the Header Details screen.
  3. Choose Goto  Operation overview. The Operation Overview screen appears.
  4. Create operations and sub-operations for your routing.
  5. Save the routing.