Changing Routings 

Use

You use this procedure to change the data of individual routings.

If you want to change objects in several or all of you routings, you should use one of the following procedures:

Changing Work Centers (Mass Changes)

Replacing PRTs (Mass Changes)

Prerequisites

The following data already exists in the system:

  • The source (routing)
  • If you want to maintain the routing with history: The corresponding change master record.

(See R/3 Library LO Engineering Change Management, Maintaining Change Master Records)

  • If you want to link the routing with a revision level: The relevant revision level of the material to be produced.

See R/3 Library LO Engineering Change Management, Assigning a Revision Level to a Material)

Procedure

  1. On the R/3 main menu choose Logistics  Production  Master data  Routings.
  2. Choose Routing Change.

Note: In the following procedure the task list type Routing is referred to, primarily in menu paths. The same paths are also valid for the other task list types (reference operation sets, rate routings and reference rate routings). If you want to maintain such an object choose the <task list type> instead of Routing.

  1. Enter the relevant data on the initial screen.
  2. Choose Enter.

The screen that then appears depends on the group you entered.

If there

you reach the

is only one routing in the group

operation overview for this routing

are several routings in the group

header overview

 

  1. The further procedure depends on which data you want to change or enter. For information, refer to

Editing Header Data

Editing Operations and Sub-operations

Editing Material Components