BOM Changes in the SAP R/3 System 

In the R/3 System, you can change bills of material either with or without saving a history.

  • Change without history

A change made during the development phase of a product that does not need to be document.

The state of the bill of material before the change is not stored. You can only process the data you last saved.

  • Change with history

A change that may require further activities within the company and which must be verified (for example, Change BOM Change routing Change inspection plan).

Engineering change management in the R/3 System enables you to document all changes.

    • The header and item records are duplicated.
    • Changes to sub-items are not saved historically, even if you make these changes with reference to a change number.