The material master record of header material RB contains an entry for assembly scrap. The subordinate component quantities must be adjusted to include the scrap.
|
Header material RB – base quantity: |
1 piece |
|
Component HBAR – component quantity: |
1 piece |
|
Required quantity (RB): |
1 000 pieces |
|
Assembly scrap (RB): |
10 % |
|
→ Scrap quantity: |
100 pieces |
The resulting component quantities for assembly RB are calculated for 1,100 pieces of assembly RB (racing bike).
