Using Individual Access for Lists 
Use
You want to display the stock/requirements situation for a particular material in the MRP list or the stock/requirements list.
Prerequisites
- You have run MRP using single-item planning or total planning.
- For MRP lists only, you have entered in the control parameters for the planning run, that the system should create MRP lists.
Procedure
- From the MRP menu or the MPS menu, choose the menu path Evaluations → MRP list - material or Evaluations → Stock/reqmts list.
The system displays the initial screen for the respective list.
- Enter the following data:
- the material number of the material, for which you want to call up the list
- the corresponding plant
- (if MRP areas have been activated on a client basis) the corresponding MRP area
- If required, choose a display filter and/or a selection rule (see Filtering Information).
You define display filters and selection rules in Customizing for MRP in the IMG activity Define display filter and Display selection rule.

You can only use selection rules for the stock/requirements list.
- Choose
.
The system displays the descriptions of the chosen settings.
- Check the settings and choose
again.
Result
The system displays the chosen list.