Individual Line Display 

Use

All MRP elements are listed individually in an individual line display. With this type of display, you can determine exactly which MRP elements currently have a material shortage.

Prerequisites

  • You have called up the MRP list or the stock/requirements list for a material.
  • You are in the individual line display. Choose if you are still in the period totals display.

Features

If you use the global settings, the system displays the following columns for the items:

  • Planning date
  • MRP element data (short description, number, item, and so on)
  • Rescheduling date
  • Exception message key
  • Receipt and requirements quantities, if necessary in two different units
  • Available quantity (planned warehouse stock), if necessary in two different units

By scrolling with the mouse in the section of the screen to the right of the MRP element column, you can also display the following columns: Start/release date, Opening date.

If the corresponding data is available, the system also displays the following columns: Scrap, Production version, Receiving plant, Issuing plant, Stock in transit, Storage location, BOM explosion number, Revision level.

The system only displays the Stock in transit column if you use stock transfer between two plants and only displays it in the receiving plant. The stock in transit is the quantity that is in transport to the receiving plant.

If the corresponding data is available, you can access the customer and vendor columns (Debitor/customer name or Creditor/vendor name) via pushbuttons.